GRANDO, LUCA
 Distribuzione geografica
Continente #
NA - Nord America 2.312
EU - Europa 648
AS - Asia 382
OC - Oceania 2
SA - Sud America 2
AF - Africa 1
Totale 3.347
Nazione #
US - Stati Uniti d'America 2.308
IT - Italia 377
CN - Cina 174
SG - Singapore 157
DE - Germania 70
FI - Finlandia 54
RU - Federazione Russa 32
SE - Svezia 31
FR - Francia 29
IN - India 22
GB - Regno Unito 15
VN - Vietnam 10
IE - Irlanda 8
NL - Olanda 8
HK - Hong Kong 7
AT - Austria 4
CA - Canada 4
ES - Italia 4
UA - Ucraina 4
IR - Iran 3
JP - Giappone 3
PL - Polonia 3
CO - Colombia 2
CZ - Repubblica Ceca 2
GR - Grecia 2
LU - Lussemburgo 2
NZ - Nuova Zelanda 2
UZ - Uzbekistan 2
BE - Belgio 1
DZ - Algeria 1
ID - Indonesia 1
KG - Kirghizistan 1
LT - Lituania 1
MY - Malesia 1
PT - Portogallo 1
TR - Turchia 1
Totale 3.347
Città #
Fairfield 363
Chandler 271
Houston 187
Ann Arbor 177
Woodbridge 176
Ashburn 171
Padova 171
Cambridge 140
Singapore 136
Seattle 124
Wilmington 95
Boardman 67
Beijing 66
Santa Clara 40
San Diego 30
Medford 29
Princeton 29
New York 24
Des Moines 23
Helsinki 22
Lappeenranta 22
Nanjing 13
Los Angeles 11
Dong Ket 10
Milan 10
Roxbury 10
Pune 9
Venice 9
Amsterdam 7
Shenyang 7
Guangzhou 6
Hong Kong 6
Nanchang 6
Paris 6
Rome 6
Selvazzano Dentro 6
Tianjin 6
Verona 6
London 5
Ogden 5
Venezia 5
Dublin 4
Genoa 4
Grafing 4
Madrid 4
Redwood City 4
Brendola 3
Brescia 3
Dallas 3
Haikou 3
Hefei 3
Nürnberg 3
Vienna 3
Albignasego 2
Auckland 2
Coquitlam 2
Delhi 2
Gandhinagar 2
Garching 2
Hebei 2
Ibague 2
Jiaxing 2
Jinan 2
Krasnoobsk 2
Loreggia 2
Mascalucia 2
Menlo Park 2
Munich 2
Naples 2
Norwalk 2
Palermo 2
Rovigo 2
Sarnico 2
Seregno 2
Spilimbergo 2
Tashkent 2
Turin 2
Vicenza 2
Voghera 2
Washington 2
Zhengzhou 2
Ahmedabad 1
Alghero 1
Algiers 1
Athens 1
Baotou 1
Berlin 1
Bishkek 1
Bologna 1
Borås 1
Bristol 1
Brno 1
Campodarsego 1
Chiswick 1
Chongqing 1
Como 1
Costabissara 1
Dearborn 1
Enschede 1
Florence 1
Totale 2.628
Nome #
Progress in the ITER neutral beam test facility 212
A substantial step forward in the realization of the ITER HNB system: The ITER NBI Test Facility 189
SPIDER in the roadmap of the ITER neutral beams 186
Overview of the RFX-mod fusion science activity 153
Start of SPIDER operation towards ITER neutral beams 151
The PRIMA Test Facility: SPIDER and MITICA test-beds for ITER neutral beam injectors 148
First operation in SPIDER and the path to complete MITICA 143
Design concepts of machine upgrades for the RFX-mod experiment 143
3D electromagnetic analysis of the MHD control system in RFX-mod upgrade 136
Upgraded electromagnetic measurement system for RFX-mod 130
Spider beam source ready for operation 128
Detailed design of the RFX-mod2 machine load assembly 110
Electrical and structural R&D activities on high voltage dc solid insulator in vacuum 108
3D electromagnetic analysis of the MHD control system in RFX-mod Upgrade 107
H-mode achievement and edge features in RFX-mod tokamak operation 99
Feasibility study of a local active correction system of magnetic field errors in RFX-mod 95
Overview of instrumentation and control in the neutral beam test facility 93
On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress 93
Optimization of RFX-mod2 gap configuration by estimating the magnetic error fields due to the passive structure currents 91
Modeling of the magnetic field errors of RFX-mod upgrade 87
Vacuum boundary modifications of the RFX-mod machine 86
Simulation and measurement of rarefied gas flow and neutral density profiles through a large multiaperture multigrid negative ion accelerator 82
First operations with caesium of the negative ion source SPIDER 81
SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection 79
Electromagnetic filaments and edge modifications induced by electrode biasing in the RFX-mod tokamak 69
Design of machine upgrades for the RFX-mod experiment. 60
Strategy for Vacuum Insulation Tests of MITICA 1 MV Electrostatic Accelerator 57
Upgraded electromagnetic measure system for RFX-mod 48
Optimizing the ITER NBI ion source by dedicated RF driver test stand 43
Upgrade of the Magnetic Fault Detection System of RFX-mod2 42
Model based computation of electromagnetic forces in magnetic confinement toroidal devices by using magnetic measurements 40
Overview on electrical issues faced during the SPIDER experimental campaigns 38
Design of a large nonevaporable getter pump for the full size ITER beam source prototype 27
Status of SPIDER beam source after the first 3.5 years of operation 26
Conceptual design of the Gas Injection and Vacuum System for DTT NBI 26
The new vessel complex for the RFX-mod2 experiment: An effective synergy between fusion research and technological development 23
Highlights of recent SPIDER results and improvements 18
Corrigendum to “Status of SPIDER beam source after the first 3.5 years of operation” [Fusion Engineering and Design, Volume 192, July 2023, 113831] (Fusion Engineering and Design (2023) 192, (S0920379623004131), (10.1016/j.fusengdes.2023.113831)) 15
Innovative Concepts in the DTT Neutral Beam Injector 2
Totale 3.464
Categoria #
all - tutte 14.817
article - articoli 12.514
book - libri 0
conference - conferenze 0
curatela - curatele 0
other - altro 0
patent - brevetti 0
selected - selezionate 0
volume - volumi 464
Totale 27.795


Totale Lug Ago Sett Ott Nov Dic Gen Feb Mar Apr Mag Giu
2019/2020374 0 0 0 0 0 0 53 84 89 69 62 17
2020/2021450 36 27 28 46 5 13 20 42 56 61 72 44
2021/2022429 10 36 51 14 27 32 20 41 29 7 63 99
2022/2023542 67 65 12 93 56 60 10 32 78 14 38 17
2023/2024435 13 51 55 29 20 61 35 25 18 42 44 42
2024/2025409 17 103 83 37 102 66 1 0 0 0 0 0
Totale 3.464