We propose a new methodology to simulate the discounted penalty applied to a wind-farm operator by violating ramp-rate limitation policies. It is assumed that the operator manages a wind turbine plugged into a battery, which either provides or stores energy on demand to avoid ramp-up and ramp-down events. The battery stages, namely charging, discharging, or neutral, are modeled as a semi-Markov process. During each charging/discharging period, the energy stored/supplied is assumed to follow a modified Brownian bridge that depends on three parameters. We prove the validity of our methodology by testing the model on 10 years of real wind-power data and comparing real versus simulated results.

Modelling a storage system of a wind farm with a ramp-rate limitation: a semi-Markov modulated Brownian bridge approach

D'Auria B.;
2024

Abstract

We propose a new methodology to simulate the discounted penalty applied to a wind-farm operator by violating ramp-rate limitation policies. It is assumed that the operator manages a wind turbine plugged into a battery, which either provides or stores energy on demand to avoid ramp-up and ramp-down events. The battery stages, namely charging, discharging, or neutral, are modeled as a semi-Markov process. During each charging/discharging period, the energy stored/supplied is assumed to follow a modified Brownian bridge that depends on three parameters. We prove the validity of our methodology by testing the model on 10 years of real wind-power data and comparing real versus simulated results.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11577/3533141
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? ND
  • OpenAlex ND
social impact