The European Union ITER Home Team analysed the possibility of feeding ITER directly from the 400 kV grid. The study was based on the assumption that ITER will be located on the sites where the 400 kV grid feeds fusion experiments in Europe at present, and was performed in cooperation with the Electric Companies concerned. This study shows, as a first approximation, the ability of the European Grid to supply the ITER load, provided that measures such as increasing the power reserve and providing reactive power compensation are taken as the site location demands

Assessment of the suitability of the european 400 kV grid to supply the ITER load

MASCHIO, ALVISE;
1995

Abstract

The European Union ITER Home Team analysed the possibility of feeding ITER directly from the 400 kV grid. The study was based on the assumption that ITER will be located on the sites where the 400 kV grid feeds fusion experiments in Europe at present, and was performed in cooperation with the Electric Companies concerned. This study shows, as a first approximation, the ability of the European Grid to supply the ITER load, provided that measures such as increasing the power reserve and providing reactive power compensation are taken as the site location demands
1995
SOFE '95 Seeking a new energy era
16th Symposium on Fusion Engineering
9780780329690
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11577/2490078
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
  • OpenAlex ND
social impact